You will find all the usual suspects still under road construction in and around the Fishers area based on the latest construction update.
Be aware of some lane restrictions likely on 96th Street at the Nickel Plate Trail.
The full road construction listing for the week beginning Monday, February 24, is below, as provided by the City of Fishers:
======
STATE ROAD 37 IMPROVEMENT PROJECT
To learn more about the State Road 37 Improvement Project and sign up to receive text updates, visit 37Thrives.com.
Watch out for a lane restriction on NB SR 37 near 141st St., traffic will be down to one lane so that the contractor can conduct emergency patching operations.
STATE ROAD 37 AND 141ST STREET
the next phase of construction. Traffic has transitioned to the eastside,
with SR37 north and southbound lanes remaining open. Please review
detour routes to plan ahead during this time. Thank you for your continued
patience and remember to drive cautiously and safely through construction
areas. View a detour for E 141st Street and SR37 here, view the
West detour here and East detour here.
To learn more about the Clear Path Improvement Project and sign up to receive text and email updates, visit clearpath465.com
I-465 & I-69
Drivers will see an increase in construction along the I-69 corridor in the coming months. This work will focus on reconfiguring the interchange at I-465 and I-69. New ramps will provide direct movements from eastbound I-465 and northbound I-465 to northbound I-69. Binford Blvd. will also be reconstructed to separate local traffic from traffic entering and exiting I-69 and I-465. Access to I-69 from Binford Blvd. will remain open.
Short-Term Closures
- 71st Street and trail closed for overhead bridge work
Long-Term Closures
- Ramp from 56th Street to I-465
- Ramp from Allisonville Road to I-465 eastbound
- Ramp from northbound Binford Boulevard to I-465 westbound
82nd Street Ramps
- Ramp from I-69 South to 82nd Street is now open
- Ramp from 82nd Street to I-69 South is open only to I-465 South
- 82nd Street ramps – current configuration
For detour routes and additional project information, visit clearpath465.com.
PROJECTS NORTH OF 116TH STREET
Please use extreme caution and follow the 35mph posted speed limit when traveling through the work zone. Left turns are prohibited in all directions at the intersection. Please see the included intersection diagram (below) for the movements that are allowed. Periodic lane closures and intermittent stoppages may be necessary to complete certain work items. Please watch for flaggers and workers in and around the construction zone. View a phase map here.
UTILITY WORK ON SOUTH STREET
Watch out for intermittent lane restrictions on South Street and Lantern Road these will be in place from 9am to 3pm. The contractor will be conducting utilility work in the area for the District South/CityView Developments.
BRIGHTSPEED FIBER INSTALLATION
Brightspeed will be installing fiber throughout the following neighborhoods: Bridger Pines, Bridger Pines West and Arbor Pines. Work will be conducted in the utility easement behind the sidewalk.
96TH STREET AND THE NICKEL PLATE TRAIL – UTLITY WORK
On the week of February 24 there will be intermittent lane restrictions on 96th street and the Nickel Plate Trail to allow for Utility Work. These restrictions will impact the outside lane of WB 96th street from Hague Rd to Menards entrance.
SIDEWALK PANEL REPAIRS
On Monday, Feb. 24 between 9 am and 3 pm there will be a lane restriction on 106th Street between Hamilton Pass and Cumberland Road while sidewalk panels are being repaired.
SIGN INSTALLATION
On Thursday, Feb. 27, the eastbound right turn lane on Fishers Corner Blvd will be closed from 9 am to 3 pm to allow for sign installation.