Be aware of traffic configuration changes at the roundabout construction along Allisonville Road and 96th Street (details below).
Not included in this update below are plans by INDOT to begin a three week closure July 12th on I-465 northbound lanes between I-65 and I-70 on the southeast side of Indianapolis. Crews will also close the northbound and southbound Shadeland Ave. ramps to I-70 eastbound.
For a road status map encompassing the City of Fishers, use this link.
Below is the Fishers-area road construction update for the work week beginning Monday, July 8, as provided by the City of Fishers:
=========================
To learn more about the State Road 37 Improvement Project and sign up to receive text updates, visit 37Thrives.com.
STATE ROAD 37 AND 141ST STREET
The final interchange of the State Road 37 Improvement Project will officially begin construction at 141st St. and State Road 37 this summer. One important note: To ease the construction burden in the area, the work will not begin until Hamilton County’s 146th St. closure at Allisonville re-opens. The full timeline for the 141st Street interchange will be provided after project bids are accepted in the Spring 2024. View detour routes here.
ROADWORK UPDATE
As of June 5th preliminary construction work has begun at SR37 & 141st Street. During this time pavement markings and concrete barriers will be placed. There will be no closures during this phase, only intermittent lane restrictions during the hours of 9AM-3PM.
Find construction updates at 37thrives.com and follow DriveFishers on X as work progresses.
WHAT TO EXPECT THIS SUMMER
The interim traffic configuration that has been in place will be adjusted to accommodate temporary pavement construction leading up to the next phase of construction. The next phase will be construction on the west side of 141st. During this time, all traffic will be moved to the east side, with north and south bound lanes open at all times on SR37 (intermittent restrictions will be communicated). All construction updates will be posted to DriveFishers on X(Twitter) and 37Thrives on Facebook. Please visit 37thrives.com to sign-up for email updates.
To navigate the merge on the west side of SR37, remember:
- Use the accel lane to gain speed, not stop
- Use your mirrors and pay attention
- Look for a gap in SR 37 traffic and safely merge
To learn more about the Clear Path Improvement Project and sign up to receive text and email updates, visit clearpath465.com
I-465 & I-69
Drivers will see an increase in construction along the I-69 corridor in the coming months. This work will focus on reconfiguring the interchange at I-465 and I-69. New ramps will provide direct movements from eastbound I-465 and northbound I-465 to northbound I-69. Binford Blvd. will also be reconstructed to separate local traffic from traffic entering and exiting I-69 and I-465. Access to I-69 from Binford Blvd. will remain open.
Long-Term Closures
- Ramp from 56th Street to I-465
- Ramp from Allisonville Road to I-465 eastbound
- Ramp from northbound Binford Boulevard to I-465 westbound
- 71st Street under I-465
82nd Street Ramps
- Ramp from I-69 South to 82nd Street closed
- Ramp from 82nd Street to I-69 South closed
82nd Street ramp to I-69 South lane restrictions
- No access to Binford Boulevard or I-465 West from 82nd Street to I-69 South
Temporary Express Lane
- Located on I-465 northbound between Fall Creek and White River
- Express Lane Map and Reminders (click to view)
82nd Street Ramp to I-69 Northbound Now Open
I-69 Northbound to 82nd Street Ramp Closure
- Ramp from I-69 North to 82nd Street (closed through mid 2024)
- Alternate Route to 82nd Street (click to view map)
- Accessing Community North Hospital (click to view map)
- More Information from Community Health Network
For detour routes and additional project information, visit clearpath465.com.
For additional project information, visit the 146th Street and Allisonville Rd. Project Page.
126TH STREET AND SOUTHEASTERN PARKWAY ROUNDABOUT
As of May 30, 2024 a full road closure is in effect for 60 days to allow for road reconstruction. The new single-lane roundabout will also include a connection for the Hunters Run development. The project will rehabilitate or reconstruct the pavement, add curb and gutter with storm sewers, and multi-use paths and/or bicycle lanes. Click here to view a detour route map and for more information visit our Capital Projects Dashboard.
141ST STREET & PROMISE ROAD ROUNDABOUT – HAMILTON COUNTY PROJECT – UPDATE
The City of Noblesville has closed the intersection of 141st St and Promise Rd to construct a roundabout as of Monday, June 17th. This closure will last approximately 60 days. The detour route signage will be in place prior to the closure. For your safety, please do not enter the construction zone. There could be open trenches or other obstacles that are unsafe.
For additional project information, visit the 141st Street and Promise Road Roundabout Project Page.
2024 ROAD RESURFACE PROJECT
The contractor is continuing work in the Fox Run and Hillsborough neighborhoods and will be working on road resurfacing at the following locations on the week of July 8:
- Walnut Creek on Fortune Drive between Andrews Place and Cumberland Road.
- 106th & Cumberland Roundabout
We are asking residents to refrain from parking vehicles on the street during active construction operations. Homeowners will be notified via door hangers prior to any curb reconstruction near their home. After ADA ramp and curb reconstruction is completed, those areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Prior to road resurfacing, residents will be notified via street signage for street parking restrictions. For additional project information, view the Capital Project Dashboard here.
View the Road Resurface Overview Map here.
Roadways and neighborhoods are prioritized based on the PASER rating condition of their pavement. You can see a map here.
The contractor will be doing sidewalk improvements and installing light foundations on North by Northeast to Kincaid Drive and 96th Street. This project consists of decorative streetlights being installed along 96th Street from North by Northeast Blvd to Cumberland Road. New medians will also be installed along North by Northeast Blvd and Kincaid Blvd with streetlights. Watch out for lane restrictions on North by Northeast from 9am-3pm. For more details visit our Capital Projects Dashboard here.
ROAD CLOSURE – 96TH STREET AND ALLISONVILLE ROAD INTERSECTION*UPCOMING SHIFTS IN TRAFFIC PATTERN*
PHASE 3
On the week of July 1, traffic was moved into phase 3A during which there will be a slight shift in traffic to allow the contractor to build the future driveway for the Circle K gas station. This gas station will still be accessible from 96th street and Allisonville Road.On or after July 22nd, the contractor will move into phase 3B, traffic will shift from the east side of Allisonville to the west and will continue to flow North and South. At this time the driveway for Circle K constructed in phase 3A will be accessible. View a map here.
On April 1st,construction began on the 96th St. & Allisonville Rd. Roundabout project This project aims to enhance connectivity along this stretch of the Allisonville Corridor. The existing Michigan Left intersection was eliminated and transitioned to a two-lane roundabout adjacent to the new River Place development. This project is slated to be completed at the end of the year, with minor enhancements completed in the Spring of 2025. You can view a close up map of what the roundabout will look like after April 9 here.
- 96th Street is closed from Allisonville Road to Hazel Dell Pkwy.
- Southbound traffic cannot turn left onto 96th St from Allisonville Rd.
- Allisonville Rd is open to one lane at 96th Street for North and Southbound traffic.
- All access to local businesses remains open.
- See suggested detour maps at 96th & Allisonville Rd Roundabout
We are in constant communication with the County on our traffic signals along 116th Street and working towards accomodating the increased traffic due to this detour. We are aware of the increased volumes due to this project and neighboring ones as well.
ROAD CLOSURE – BRIDGE 187 (106TH STREET OVER MUD CREEK)- HAMILTON COUNTY PROJECT
Please be advised, 106th Street between Cumberland Road and Hamilton Pass has been closed to all thru traffic for a bridge replacement project. The anticipated roadway reopening date is Friday, October 18, 2024.
Local traffic will continue to have access to their homes, while thru traffic is asked to utilize the posted detour route of Cumberland Road, 96th Street, and Mollenkopf Road. For more details visit the Hamilton County page.
HERITAGE PARK BRIDGE – TRAIL CLOSURE
The City of Fishers has partnered with the City of Carmel, Clay Township, Carmel Clay Parks and Recreation, Hamilton County, and Delaware Township to connect Heritage Park at White River and Carmel’s Hazel Landing Park with a bridge over White River. This new amenity will provide enhanced connectivity between the two communities, as well as new recreational opportunities for our residents. To construct this bridge, the contractor will need to restrict access to a portion of Heritage Park’s loop trail that runs adjacent to the river through the woods beginning the week of March 4, click here for an ariel view. During this time, you’ll notice temporary construction fencing going up as we prepare for construction. Beginning the week of March 11, the contractor will work to clear the necessary trees between the park and river. Bridge construction will follow beginning in May. Construction is expected to occur Monday through Saturday beginning at 7 a.m. The bridge is expected to be complete in August 2025.
while Verizon contractors install underground facilities. Lane restrictions will be in
place between the hours of 9 am and 3 pm.
Parkside/Publishers
Work on Barrett East is substantially complete. See a map here.
Fishers Trade Center
The contractor will be working on road reconstruction north of 135th St. and south of 141st St. the week of July 1. The construction traffic route is one way, heading north from 135th to 141st St. See a map here.
Restoration will resume in Britton Ridge Neighborhood. Restoration work will be underway in Saxony neighborhood. The sidewalk work will consist of removal and replacement of sidewalk panels which pose a toe kick trip hazard. Sidewalk within driveways is not included in the scope of this project.