Another long list of road construction projects in and around Fishers in the coming week. Note that the city is planning to move State Road 37 lanes to the east as construction begins on the roundabout at 141st Street this summer.
Here is the complete listing, as provided by the City of Fishers:
To learn more about the State Road 37 Improvement Project and sign up to receive text updates, visit 37Thrives.com.
STATE ROAD 37 AND 141ST STREET
The final interchange of the State Road 37 Improvement Project will officially begin construction at 141st St. and State Road 37 this summer. The pre-construction meeting for the project team will take place at the end of May with the schedule to soon follow. One important note: To ease the construction burden in the area, the work will not begin until Hamilton County’s 146th St. closure at Allisonville re-opens. The full timeline for the 141st Street interchange will be provided after project bids are accepted in the Spring 2024. View detour routes here.
WHAT TO EXPECT THIS SUMMER
The interim traffic configuration that has been in place will be adjusted to accommodate temporary pavement construction leading up to the next phase of construction. The next phase will be construction on the west side of 141st. During this time, all traffic will be moved to the east side, with north and south bound lanes open at all times on SR37 (intermittent restrictions will be communicated). All construction updates will be posted to DriveFishers on X(Twitter) and 37Thrives on Facebook. Please visit 37thrives.com to sign-up for email updates.
To navigate the merge, remember:
- Use the accel lane to gain speed, not stop
- Use your mirrors and pay attention
- Look for a gap in SR 37 traffic and safely merge
To learn more about the Clear Path Improvement Project and sign up to receive text and email updates, visit clearpath465.com
I-465 & I-69
Drivers will see an increase in construction along the I-69 corridor in the coming months. This work will focus on reconfiguring the interchange at I-465 and I-69. New ramps will provide direct movements from eastbound I-465 and northbound I-465 to northbound I-69. Binford Blvd. will also be reconstructed to separate local traffic from traffic entering and exiting I-69 and I-465. Access to I-69 from Binford Blvd. will remain open.
Crews closed the two ramps at 82nd Street on Monday, January 29. These ramps will remain closed throughout most of 2024.
- Ramp from I-69 South to 82nd Street
- Ramp from 82nd Street to I-69 South
The contractor will occasionally utilize a lane restriction for the delivery of materials in the work area (from 9AM to 3PM). These lane restrictions will take place in the left-hand westbound lane of 146th Street.
For additional project information, visit the 146th street and Allisonville rd. Project Page.
90-DAY ALLISONVILLE ROAD CLOSURE
Please be advised, the contractor has closed Allisonville Road between 146th Street and Kensington Drive, and between 146th Street and Helmsley Court. This will remain closed for 90 calendar days. Property owners within the limits of the closure of Allisonville Road will have access to their property during the closure. Both eastbound and westbound 146th Street will open to all through traffic throughout the closure of Allisonville Rd. The contractor will be placing detour route markers as we approach the road closure. Please utilize the posted detour route to avoid the road closures on Allisonville. View the road closure and detour route here.
141ST STREET & PROMISE ROAD ROUNDABOUT – HAMILTON COUNTY PROJECT
The City of Noblesville has plans to begin construction on a roundabout at 141st and Promise road this summer 2024. For additional project information, visit the 141st Street and Promise Road Roundabout Project Page.
2024 ROAD RESURFACE PROJECT
ADA ramp and curb reconstruction is ongoing in Lantern Ridge, towards the end of the week the contractor will continue into Sunblest as part of the 2024 Resurfacing Project. We are asking residents to refrain from parking vehicles on the street during active construction operations. Homeowners will be notified via door hangers prior to any curb reconstruction near their home. After ADA ramp and curb reconstruction is completed, those areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Prior to road resurfacing, residents will be notified via street signage for street parking restrictions. For additional project information, view the Capital Project Dashboard here.
View the Road Resurface Overview Map here.
Roadways and neighborhoods are prioritized based on the PASER rating condition of their pavement. You can see a map here.
FLORIDA ROAD CLOSURE
The contractor will begin full depth milling and concrete work for the medians on North by Northeast next week . This project will consist of decorative streetlights being installed along 96th Street from North by Northeast Blvd to Cumberland Road. New medians will also be installed along North by Northeast Blvd and Kincaid Blvd with streetlights. Watch out for lane restrictions on North by North East from 9-3pm. For more details visit our Capital Projects Dashboard here.
ROAD CLOSURE – 96TH STREET AND ALLISONVILLE ROAD INTERSECTION
This project aims to enhance connectivity along this stretch of the Allisonville Corridor.
The existing Michigan Left intersection was eliminated and transitioned to a two-lane
roundabout adjacent to the new River Place development. This project is slated to be
completed at the end of the year, with minor enhancements completed in the Spring
of 2025. You can view a close up map of what the roundabout will look like after
April 9 here.
Here’s what to expect:
Closures – After April 9, 2024
- 96th Street is closed from Allisonville Road to Hazel Dell Pkwy.
- Southbound traffic cannot turn left onto 96th St from Allisonville Rd.
- Allisonville Rd is open to one lane at 96th Street for North and Southbound traffic.
- All access to local businesses remains open.
- See suggested detour maps at 96th & Allisonville Rd Roundabout
We are in constant communication with the County on our traffic signals along 116th Street and working towards accomodating the increased traffic due to this detour. We are aware of the increased volumes due to this project and neighboring ones as well.
Please be advised, 106th Street between Cumberland Road and Hamilton Pass has been closed to all thru traffic for a bridge replacement project. The anticipated roadway reopening date is Friday, October 18, 2024.
Local traffic will continue to have access to their homes, while thru traffic is asked to utilize the posted detour route of Cumberland Road, 96th Street, and Mollenkopf Road. For more details visit the Hamilton County page.
HERITAGE PARK BRIDGE – TRAIL CLOSURE
Parkside/Publishers
Work on Barrett East is substantially complete.
Fishers Trade Center
The contractor will be working on road reconstruction north of 135th st. and south of 141st st. the week of May 13. The construction traffic route is one way, heading north from 135th to 141st st.
Howard Companies is going to be working in the Sweet Briar Neighborhood on the week of May 20. The sidewalk work will consist of removal and replacement of sidewalk panels which pose a toe kick trip hazard. Sidewalk within driveways is not included in the scope of this project.
Project Scope: Drainage improvements and structural rehabilitation of Masters Road from 96th Street to 87th Street and Shadeland Avenue from Kensington drive to 52nd Street. The project will be encompassed in two phases.
Masters Road – Phase Two Operations
- One lane traffic on Masters Road from 96th to 82nd
- Phase two operations coincide with the completion of phase one starting the week of April 15 through the week of June 10.
- Indy DPW will be performing road repair and resurfacing on Masters between 87th and 96th
- We will keep all traffic druing this phase heading Southbound through the construction site.
To view a map of Phase 2 click here,
For more info visit Indianapolis Thoroughfare Drainage Improvements – Area 3 page.