The Hamilton County Highway Department has issued another update on the construction project ongoing at 146th Street and Allisonville Road. Here is that update:
==========
Friday, March 22 into Saturday, March 23: Our contractor will be completing work in preparation of the upcoming phase switch of 146th Street. At various times between 9am Friday to 7pm Saturday, the contractor will have workers in or near the travel lanes to complete pre-phase switch work items. Short duration lane closures when in-lane preparation work is requires should be expected.
Saturday, March 23 into Sunday, March 24: Beginning at 7pm, the contractor will utilize lane closures and short duration closures to implement the traffic pattern change. The new traffic pattern will be in place by Sunday morning.
Please use extreme caution while driving through this construction zone. We have continued to notice a lot of traffic going above the posted speed limit of 35 mph, so the Fishers Police Department, Noblesville Police Department, and the Hamilton County Sheriff’s Department have increased patrols along 146th Street. Please be cognizant of the speed limit. It is posted at 35 mph for a reason. We would love to keep our construction crews safe, as well as local traffic exiting their subdivisions, through this heavily traveled thoroughfare.