A closure of 126th Street over I-69 and traffic changes for Spark Fishers. That, plus the ongoing construction and neighborhood street resurfacing, are part of this week’s road construction update.
Here is the latest, as provided by the City of Fishers:
========
All left-turn lanes are currently restricted on SR 37 and on 146th Street with traffic moved to the interior lanes. Thru traffic and right turns on SR 37 and 146th Street will remain open. Drivers are encouraged to seek alternate routes for all left turn access. View an alternate route map here. STATE ROAD 37 AND 131ST/135TH STREET 135th Street, east of SR 37, is currently closed as work progresses on the project. This closure will be in place until early July. SR 37 will remain open both northbound and southbound and allow right in/right out access at 131st Street. View the detour map here. Please drive with caution through this area. To learn more about the State Road 37 Improvement Project and sign up to receive text updates, visit 37Thrives.com.
STATE ROAD 37 AND 146TH STREETThe inside lane of the Technology Drive is currently closed to traffic to allow for construction of new pavement in the inside lane. One-way traffic will be in place in the outside lane as shown here. Access to all businesses will be maintained during the construction.
The intersection at Southeastern Pky. & Cyntheanne Road is currently closed for roundabout construction and is anticipated to reopen by the end of July. View the detour map here. Schoolhouse 7 Café will remain open for business during construction. View how to access their business here.
Beginning at 9 p.m. on Sunday, June 26, 126th Street, between Hoosier Road and Promise Road, will be closed in both directions for bridge repairs being completed by INDOT and is anticipated to reopen by Noon on Friday, July 1, weather permitting. View detour map here.
On Friday, July 1, there will be lane restrictions on Brooks School Road between Aldenham Blvd. and Club Point Drive, weather permitting, to allow for utility work behind the asphalt path. Flaggers will be in place to help direct traffic.
On Monday, June 27, the outside westbound lane of 116th Street, just before the Nickel Plate Trail bridge will be restricted between 9 a.m. and 3 p.m. for sidewalk work. Arrow boards will be in place.
Road closures and parking restrictions will be in effect around the Municipal Complex during the Spark! Fishers festival through Saturday, June 25. A full list of restrictions and closures can be found here.
ADA ramp and curb reconstruction has started taking place in Charleston Crossing, Eller Trails, Lantern Overlook, and Sunblest as part of the 2022 Resurfacing Project. Homeowners will be notified via door hangers prior to any curb reconstruction near their home. After ADA ramp and curb reconstruction is completed, those areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Prior to road resurfacing, residents will be notified via street signage for street parking restrictions.