Below is the listing of street and road projects scheduled in and around the City of Fishers for the work week that starts Monday, April 16th. As you can see, construction is beginning to ramp-up again for the spring season.
Below is the listing, as provided by the City of Fishers:
===============
CUMBERLAND ROAD
On Monday, April 16, weather permitting, the southbound right turn lane on Cumberland Road at 116th Street will be closed for curb work.
116TH STREET
Expect possible lane restrictions beginning on Monday, April 16, weather permitting, at the intersection of 116th Street and Brooks School Road to complete ramp replacements in all four corners of the intersection.
106TH STREET
106th Street is closed to through traffic from Eller Road to Allisonville Road and from Allisonville Road to Hague Road for the 106th Street Infrastructure Project. Closures for through traffic will also take place from Hague Road to the Crosspoint Boulevard/Lantern Road roundabout.
131ST STREET
Periodic lane restrictions will occur at the intersection of 131st Street and Cumberland Road as utility relocation work is completed. Expect lane restrictions, weather permitting, along 131st Street between Allisonville Road and Lantern Road for the construction of the Conner Trail from Conner Prairie to the Municipal Complex. Lane restrictions will also take place on Lantern Road between 131st Street and Municipal Drive.
ELLER ROAD
Eller Road is closed to through traffic south of White Horse Lane for concrete work associated with the 106th Street
ALLISONVILLE ROAD RESURFACING & INTERSECTION IMPROVEMENTS PROJECT
Lane restrictions will be in place, as weather permits, along Allisonville Road from 126th Street to 131st Street for tree clearing ahead of the start of the roadway expansion project. Restrictions will be in place between 9 a.m. and 3 p.m. and flaggers will be on site directing traffic, as necessary.
STATE ROAD 37
The Meeting Minutes and Meeting Presentation from the December State Road 37 Project Public Meeting, along with additional information about the project, is available on the project’s new website. The State Road 37 improvement project is a $124 million joint project between Fishers, Hamilton County, Noblesville, and INDOT. Questions or
concerns may be directed to drivefishers@fishers.in.us
I-69
As part of a $92 million design-build contract, Milestone has added a third lane in each direction to the median, repaired and resurfaced existing pavement, and rehabilitated bridges and drainage structures on 15 miles of I-69 in Hamilton and Madison counties. Construction of an additional auxiliary lane between the 116th Street entrance ramp to
I-69 South and the I-69 South Exit 204 ramp to 106th Street will continue through next spring. I-69 South will be temporarily reduced to two lanes to allow space for the State Road 37 and 116th Street entrance ramps to safely merge while construction continues on the southbound auxiliary lane between the 116th Street and 106th Street ramps. Questions about this project should be directed to INDOT at 1-855-463-6848.
While this list encompasses numerous project updates, it does not list all DPW projects throughout the city. The most recent projects are detailed, however please keep in mind that all construction activities are weather permitting. We appreciate motorists’ patience and caution while driving through construction sites.